Jiangsu, China
Business Type:
Manufacturer/Factory
Number of Employees:
15
Year of Establishment:
2010-04-02
Management System Certification:
ISO 9000
OEM/ODM Service
Sample Available

Filling Equipment, Soft Drink Filling Equipment, Carbonated Drink Filling Equipment manufacturer / supplier in China, offering Carbonated Soft Drink Filling Equipment (BCGF18-18-6), Zhangjiagang Pure Water Filter Factory, Drinking Water UV Sterilizer (ZM-1000) and so on.

Gold Member Since 2010
Audited Supplier
  • Carbonated Soft Drink Filling Equipment (BCGF18-18-6)
  • Carbonated Soft Drink Filling Equipment (BCGF18-18-6)
  • Carbonated Soft Drink Filling Equipment (BCGF18-18-6)
  • Carbonated Soft Drink Filling Equipment (BCGF18-18-6)

Carbonated Soft Drink Filling Equipment (BCGF18-18-6)

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $23,000/ Piece
Port: Shanghai, China
Production Capacity: 100 PCS/Year
Payment Terms: T/T
Condition: New
Customized: Customized
Voltage: 380V
Composition: Filling Machine
Processing Material: Natural Ingredients
Process: Frozen and Chilled

You Might Also Like

Loading...

Basic Info

Model NO.: BCGF18-18-6
Cap Type: Crown Cap
Washing Heads: 18
Filling Heads: 18
Capping Heads: 6
Trademark: Mars
Transport Package: Wooden Case
Specification: CE
Origin: Zhangjiagang
HS Code: 8422301090

Product Description

Carbonated Soft Drink Filling Equipment:
1. Sparkling beverage
2. Carbonated beverage
3. Soda water
4. Washing filling capping 3 in 1 machine

Sparkling beverage filling equipment for sparkling beverage bottle washing filling capping.

Technical parameter:
Model: DCGF18-18-6
Production capacity: 4000-5000b/h (basis on 500ml bottle)
Filling precision: ≤ ± 5mm(liquid level)
Filling pressure: 0.4Mpa
Polyester bottle specification: Bottle diameter: φ 50-φ 110mm
Bottle height: 150-320mm
Total power: 5.03kw
Total weight: 3500Kg
Overall dimension: 2450× 1800× 2200mm


Commercial Items:

Payment: 30% deposit by T/T in advance, the balance of 70% paid before shipment by T/T.
 
Warranty: 12 months from shipment date. During one year we can provide parts for
free due to bad quality, but human error is not included. From the second year, parts only
collect cost price.
 
Shipment: Within 50 working days after receiving deposit and bottle samples.
 
Installation and Commissioning:
We can send engineer to help installation and debugging for the machine in local of customer, also train the worker how to operate and maintain the equipment.
 
The round tickets, boarding in local are done by the customer and US$50/person/day should be afforded by the customer.

Send your message to this supplier

*From:
*To:
avatar Mr. Eli Yao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now