Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)

Product Details
Customization: Available
Application: Food
Packaging: Case
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2010-04-02
Management System Certification
ISO 9000
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
  • Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
Find Similar Products

Basic Info.

Model NO.
SSL-1410
Driven Type
Electric
Manner of Packing
Both Ends Open
Adjust Speed
Frequency Conversion Speed Regulation
Type
PE Shrink Film Machine
Heating Mode
Stainless Steel Heating
Packaging Material
Film
Transport Package
Wooden Case
Specification
CE
Trademark
Mars
Origin
Zhangjiagang
HS Code
8422309090
Production Capacity
200 PCS/Year

Product Description

Thermal Shrink Tunnel is used for shrinking of film wrapped bottles by manual.

Main Technical Specifications
Conveyor Speed 0-10m/min
Heating Temperature 0-300ºC(adjustable)
Power 8.8Kw
Voltage 380V,50HZ
Weight 300Kg
Tunnel length 1410mm
Tunnel width 830mm
Tunnel height 1110mm
Distance from inlet to tunnel 200mm
Distance from outlet to tunnel 200mm
 
Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)

Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)
Carbonated Drink Bottles Thermal Shrink Tunnel (SSL-1410)

FOB Shanghai Price: USD3,000
Packing: wooden case
Payment: 100% by T/T in advance.
Warranty: 12 months from shipment date. During one year we can provide parts for free due to bad quality, but human error is not included. From the second year, parts only collect cost price.
Shipment: Within 20 working days after receiving deposit and bottle samples.
Installation and Commissioning: We can send engineer to help installation and debugging for the line in local of customer, also train the staff how to operate and maintenance the equipment.
 
The round tickets, boarding in local are done by the customer and US$100/person/day should be afforded by the customer.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier