15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()

Product Details
Customization: Available
After-sales Service: 2 Years
Warranty: 2 Years
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2010-04-02
Management System Certification
ISO 9000
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
  • 15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
Find Similar Products

Basic Info.

Model NO.
DCGF40-40-12
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Surface Type
Filling Principle
Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Filling Heads
40
Washing Heads
40
Capping Heads
12
Production Speed
15000bph
Transport Package
Wooden Case
Specification
CE
Trademark
Mars
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
180 PCS/Year

Product Description

15000BPH DCGF40-40-12Automatic Carbonated Beverage Filling Machine

The series equipment is used in production of PET bottle-packing carbonated beverage such as aerated water, sprite, coca-cola, gas containing juice with the capacity from 2,000-30,000B/H
 
Main Feature:
1. This machine has a compact structure, perfect control system, easy to operate and highly automatic degree.
2. The parts contact with product is made of quality SUS, anti-corrosive, and easy to clean.
3.  By adopting high speed filling valve, the liquid level is precise and no waste. That guarantees the demand of filling technology.
4.  The capping head adopts constant torque magnetic device to guarantee capping quality and impact cap.
5. This machine has a high efficient cap arranging system, perfect cap feeding and protection device.
6.  Equipped with perfect clean management system to ensure the bottle clean.
7.  Only by changing the star-wheel, can realize to fill the changed bottle shape.
8.  The machine adopts perfect overload protective device can ensure the operator and machine safe.
9.   This machine adopts adjustable frequency converter.
10. The main electric components, frequency, photoelectric switch, proximity switch, electric control valves all adopt imported components, which can ensure the quality performance.
11. The control system has many functions, such as control producing speed, cap shortage detection, bottle block automatic stop and production counting etc.
12.  The electric components and pneumatic components are all introduced from world famous brand products.
 
Technical parameter:
Model DCGF40-40-12
Production capacity 13,000-14,000B/H (basis on 500ml bottle)
Filling precision ≤±5mm(liquid level)
Filling pressure <0.4Mpa
Polyester bottle specification bottle diameter:φ50-φ110mm
bottle height: 150-320mm
Suitable cap type plastic screw cap
Water pressure of washing bottle 0.18-0.25Mpa
Water consumption for washing bottle 2500Kg/h
Spraying position 18
Dripping bottle position 10
Gas source pressure 0.7Mpa
Gas consumption 1m3/min
Total power 10Kw
Total weight 9500Kg
Overall dimension
 
4500×3300×2750mm
 
15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
 
15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()
15000bph Dcgf40-40-12 Automatic Carbonated Beverage Filling Machine ()



Packing: wooden case
 
Payment: 30% down payment by T/T in advance, the balance of 70% paid before shipment by T/T.
 
Warranty: 12 months from shipment date. During one year, we can provide parts for
free due to bad quality, but human error is not included. From the second year, parts only
collect cost price.
 
Shipment: Within 35 working days after receiving deposit and bottle samples or drawing.
 
Installation and Commissioning:
We can send engineer to help installation and debugging for the line in local of customer, also train the staff how to operate and maintenance the equipment.

The round tickets, boarding in local are done by the customer and US$100/person/day should be afforded by the customer 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier