• Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
  • Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
  • Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
  • Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
  • Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
  • Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)

Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)

Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Feed Cylinder Structure: Single-Room Feeding
Dosing Device: Surface Type
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
CGF14-12-5
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Transport Package
Wooden Case
Specification
CE, SGS
Trademark
Mars
Origin
Zhangjiagang
HS Code
8422301090
Production Capacity
180 Pieces/ Year, 4000bph

Product Description

Non-Carbonated Soft Drink Filling Machine :

Technical parameter:
Model CGF14-12-5
Production capacity 3,000-4,000B/H(basis on 500ml bottle)
Filling precision ≤±5mm(liquid level)
Polyester bottle specification bottle diameter:φ50-φ120mm
bottle height: 150-340mm
Suitable cap type plastic screw cap
Water pressure of washing bottle 0.18Mpa
water consumption for washing bottle 800Kg/h
Spraying position 5
Dripping bottle position 3
Gas source pressure 0.7Mpa
Gas consumption 0.3m3/min
Total power 4.23Kw
Overall dimension 2100×1500×2200mm
Total weight 2500Kg

Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)


Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)Non-Carbonated Soft Drink Filling Machine (CGF14-12-5)
Packing: wooden case
 
Payment: 100% by LC at sight.
 
Warranty: 12 months from shipment date. During one year we can provide parts for free due to bad quality, but human error is not included. From the second year, parts only collect cost price.
 
Shipment: Within 25 working days after receiving deposit and bottle samples.
 
Installation and Commissioning: We can send engineer to help installation and debugging for the line in local of customer, also train the staff how to operate and maintenance the equipment.
 
The round tickets, boarding in local are done by the customer and US$80/person/day should be afforded by the customer.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now